Back to Global FoodMate |Add To Favorites | Browse
regular members

plastic pallet manufacturer

plastic pallet manufacturer

Saturday,Apr 05, 2025
Product category
  • No categories temporary
Search
 
Certifications
  • not upload temporary
Friendly link
Current Position:Home » Our News » secondary containment pallet
Our News
secondary containment pallet
Posted:Jun 08, 2022        Views:481        Back to List
 Hello, I am small make up, today to introduce in detail for secondary containment pallet all plastic pallet load and what are the main factors.
1, the effect on the bearing gravity plastic pallet larger material is its manufacturing. If all materials are made of new material and other additives added, so the plastic tray in various aspects (dynamic load, static load, shelf load) of the bearing performance of gravity is relatively good. Plastic tray in whole or in part by recycling and use of materials, has a better performance. At the time of purchase, therefore, we need to clear about their production material, when the manufacturer delivery fee, check the quality of the plastic tray. If you use the material shortage, the use of the product would also be affected.
2, some plastic tray can have built-in steel pipe. Plastic tray built-in steel tube, can improve the bearing capacity of the pallet, prolong the service life of the tray. Generally speaking, the shelves of tray is a steel tube with built-in design, therefore, when the goods packed in pallets part weight will be applied on the steel tube, thereby reducing the load of plastic tray, and less deformation of the plastic tray, so as to prolong the shelf life. The service life of plastic tray. In plastic pallet on the shelves can be very safe loading of the goods.
3, the structure of the tray bearing plastic pallet manufacturer capacity has a great influence on the tray. Ship bottom type, shelf bearing ability is quite good, the structure can meet the length direction of the use of manual hydraulic pallet, forklift truck, machinery forklift in the width direction. Is square at the bottom of the frame structure, make more even, at the bottom of the pile under more gravity. Nine foot type bearing low gravity, force nine at the bottom of the foot, the upper hollow, suitable for carrying lighter goods, its weight is lighter. Double-sided plastic tray, fluctuation structure is the same, the structure design more reasonable, piled up, the stress is more uniform. Therefore, the gravity load capacity is very big also. In short, if the structure of the plastic tray design is reasonable, the tray body force uniform. As long as all other aspects, the bearing capacity of the plastic tray is big.
Plastic card board audit suppliers evaluation report, audit documents and technical appraisal about new technology, new technology. Participate in equipment supply supervision bidding work in the process of the main supply of the equipment of the project bidding check whether credit recite for manufacturers. Plastic card board manufacturer production qualification, audit order o collaterals. Participate in equipment purchase contract review quality review clause. Plastic card board spot check the purchase order, for in the contract equipment specification, type, grade, acceptance standard and so on the terms of the quality is clear.
Outsourcing standard review. Spot check main plastic pallet price outsourcing contracts, whether in the contract on machining pattern forms, such as acceptance standard terms and conditions to be specified. To participate in the tao work of material supply and outbound inspection. Monitoring equipment library is required in accordance with the acceptance process, including checking material certificate, certificate of approval of raw materials and equipment, inspection reports, etc. Plastic card board manufacturers equipment the reinspection. According to the situation of spot check, for project to make the necessary the reinspection do not coincide with suspicion. Acceptance to the special material. Spot check whether direct materials, special materials at the scene of the production according to the standards for acceptance. Equipment quality spot checks, according to the specified proportion to supply equipment quality audit. Equipment outbound conformity certificate. To supervise and inspect the equipment whether outbound qualified certificate ready.